The Sixth Street Viaduct is the largest bridge project in the history of Los Angeles. The $588 million structure, funded by the Federal Highway Administration, the State of California and the City, replaced the original 1932 viaduct, a Hollywood landmark that had to be demolished because of seismic vulnerability and a chemical reaction degrading its concrete supports. The old bridge closed in 2016, construction began in 2017, and the new 3,500 ft span opened to the public on 10 July 2022, reconnecting the downtown Arts District with Boyle Heights across the Los Angeles River, the 101 Freeway and 18 sets of railroad tracks.
The new viaduct carries 10 ft wide bike lanes in both directions. To keep those lanes physically separated from traffic, Rosehill Highways supplied 930 bespoke recycled-rubber cycle lane dividers, developed with US traffic safety specialists US Reflector Co. and manufactured in the UK.
Opening night, 10 July 2022: the dividers separating the bike lane from traffic on the new viaduct
The Challenge
The Challenge
!The new bike lanes needed physical protection from the adjacent traffic lanes on a brand-new concrete bridge deck
!Units had to attach quickly and securely to the road surface, without breaking out the deck
!The profile had to meet local requirements and carry a US-specification delineator post, rather than adapt a standard UK product
!The dividers had to be removable, reusable and redeployable as the scheme evolves
Objectives
Project Objectives
Provide physical separation between the bike lanes and general traffic on the viaduct
Surface-fix every unit without breaking out the new deck
Shape the unit to the local specification rather than adapt a standard catalogue profile
Offer a lower-carbon alternative to traditional materials
Deliver in time for the summer 2022 opening
Our Solution
The Solution
In 2021, as the viaduct neared completion, traffic safety specialists US Reflector Co. approached Rosehill Highways to develop a sustainable way of protecting the bike lanes. Working with their engineers and designers, we developed a bespoke lane divider for the project, which US Reflector Co. brand StarCurb for the US market
Each divider is a solid rubber unit moulded in the UK using our cold-cure process, from 100% recycled tyre rubber bonded with Rosehill Polymers' polyurethane binder
The low, tapered profile is surface-fixed to the deck and carries a US Reflector Co. delineator post, giving cyclists a clear visual and physical boundary
Because the units are fixed rather than cast in, they can be removed, reused and redeployed if the lane layout changes
The bespoke divider: a solid recycled-rubber unit, surface-fixed to the deck, with the delineator post mounted on top
Results & Impact
Results
930Units Supplied
3,500 ftBridge Span
100%Recycled Tyre Rubber
Both bike lanes on the viaduct have been protected by the dividers since the bridge opened in July 2022
Units can be lifted and redeployed as the scheme evolves, extending their service life
A bespoke profile delivered to a US specification, showing that Rosehill can design and manufacture to local requirements
A lower-carbon alternative to traditional materials, made from 100% recycled tyre rubber
Rosehill's recycled-rubber divider carrying US Reflector Co.'s delineator post on opening day
Need a Bespoke Cycle Lane Solution?
This case study shows how Rosehill Highways can design and manufacture a lane divider to a local specification and deliver it anywhere in the world.